Search…

Build & Backlog

Helix Instruments · is the $811.0M forecast real — and can we make the $840.0M plan at the win rate we actually convert at?

UNDERSTAND
Pilot
LIVEData as of 29 May 2026, 16:42 · last feed run 11 min ago
Back to Cockpit

Two questions, one tab. First, the build-up shows how the $811.0M is composed — beginning backlog through net-new, each block shown raw vs the risk-adjusted figure the agent will stand behind. Then the coverage test asks whether that backlog + pipeline reach the $840.0M plan at your actual win rate — and, if not, prices the only two ways to close the gap.

What the number is made of — raw vs risk-adjustedsolid = risk-adjusted · outline = raw
$256.4M$512.8M$769.3M$1.0B$711.9MBeginning backlog+$22.1Mraw +$71.9MRenewals+$27.3Mraw +$67.6MExpansion−$5.7MContraction−$9.1MChurn+$64.6Mraw +$203.3MNet-new bookings$811.0MForecast

Forecast lands at $811.0M after the agent’s risk haircuts (the outline-to-solid gap on each block).

Can we make the number?

At your 42% win rate, backlog + pipeline land $811.0M of the $840.0M plan — $13.1M short. Coverage is 0.7× against the 2.4× your win rate needs.

What the $811.0M is made of
Contracted · $693.2M
Expected pipeline · $117.8M
+$225.0M hoped

$693.2M is already contracted — the $117.8M expected leg rests on winning open pipeline; the hatched $225.0M is upside, not in the number.

Pipeline coverage vs win-rate target0.7× / target 2.4×

You convert 42% of pipeline, so you need 2.4× coverage to make plan — you’re carrying 0.7×.

Two ways to close the $13.1M — pick one (or split)
Convert better

Lift win rate to 38% (+0 pts) on the $342.8M open pipeline you already have.

Build more

Add $31.2M of new qualified pipeline at today’s 42% win rate to cover the gap.

Backlog & pipeline quality
97%
of remaining plan covered by forecast
$228.9M
risk haircut on the raw build

Open pipeline runs 0.7× the remaining plan against a 2.4× target — coverage is thin, so the to-go number leans on conversion, not new pipeline.

Inspect the deals

The expected leg rests on 164 open pipeline deals, weighted to $117.8M after win-rate and land-in-period haircuts.

Qualify 47Develop 35Propose 30Negotiate 52
Inspect stage, risk & blockers in Pipeline & Risk

How this quarter stacks up vs history

Coverage at the same pre-quarter offset
this year vs prior years · never vs a finished quarter
target 2.4×
0.7×
Q2 FY2026
0.6×
Q2 FY25
0.6×
Q2 FY24

Entering the quarter at 0.7× vs the 2.4× your 42% win rate needs — ahead of the same point last year (0.6×).

QTD pace vs prior quarterindexed to business-day into quarter
50% in100% in
This Q (QTD) Prior Q

QTD you’ve closed $127.4M; at the same point last quarter you were at $111.1M — +$16.3M ahead oflast quarter’s pace.

Pipeline by stage — raw vs win-rate-weightedsolid = weighted by actual win rate · outline = raw
Qualify · 47$9.4M / $88.9M raw
Develop · 35$17.2M / $78.3M raw
Propose · 30$22.0M / $55.3M raw
Negotiate · 52$65.4M / $120.4M raw

$342.8M of raw open pipeline collapses to $114.0Monce you weight each stage by the win rate your history actually converts — the gap is the optimism in the rep’s call. Later stages survive the haircut best.